Contract Name: Provide and Install Two (2) Sets of Doubles Doors
Project Location: Water Filtration Building, Afghanistan
Date of completion of Work: 9-Sep-04
Description of Work: The Subcontractor is required to fabricate and install (2) set of double doors for both North and South Water Filtration Buildings for a total of (4) individual doors. The doors shall be fabricated out of metal and be isulated. They shall be waterproof, tightly constructed and painted with a minimum of (1) coat metal primer and 3 finish coats of paint suitable for metals exposed to the elements. The final finish color shall be a tan color unless otherwise directed by the KBR representative.